Study window work - March to May 2009

We think the bathroom used to have a separate room for a loos as it had a small and larger window, but we wanted a larger window to match that of the back bedroom. SO I made a new sah frame, got it glazed with some sealed units and then foudn some heavy sash weights...


New sash window frame
New sash window frame

Sash being glued
Sash being glued

Old guttering with rotten facia
Old guttering with rotten facia

Original bathroom windows
Original bathroom windows

Scaffold up!
Scaffold up!

For gutter work and other things up there
Smaller window removed
Smaller window removed

Bricks chipped out
Bricks chipped out

Partially bricked up smaller window
Partially bricked up smaller window

View from scaffold
View from scaffold

Partially bricked up smaller window
Partially bricked up smaller window

Larger window removed
Larger window removed

Larger window
Larger window

Lower lefthand corner of new opening
Lower lefthand corner of new opening

Righthand side bricked up
Righthand side bricked up

Openings shuttered up
Openings shuttered up

Brickwork above old lintel mostly removed
Brickwork above old lintel mostly removed

New (old) lintel inserted
New (old) lintel inserted

New opening
New opening

Arch former in
Arch former in

As seen from inside
Arch former
Arch former

Just practising placing the bricks...
Arch complete
Arch complete

And new facia board. Waste pipe from above had to be cut to allow access. First time I laid the bricks I used too much mortar and we ended up with a gap too small for a brick and too big to fill. We started again but laid the bricks out carefully without mortar first and marked the former.
Other arch
Other arch

For comparison